You can’t claim that! Court finds exclusion clauses work just like any other clause
The recent case of Mott MacDonald Limited v Trant Engineering Limited serves as a timely reminder that exclusion clauses in construction contracts can and do work and will be enforced by the courts to prevent what may otherwise be valid claims write Clare Mendelle and James Goldthorpe.
Mott MacDonald Limited v Trant Engineering Limited [2021] EWHC 754 (TCC)
Factual Background
Motts was engaged to provide design consultancy services to Trant, a contractor carrying out works at a military base in the Falkland Islands. Disputes rapidly developed between the parties and so they entered into a Settlement and Services Agreement (SSA) to both settle these and manage their future conduct. The SSA contained a limitation/exclusion clause which stated:
Notwithstanding any other term to the contrary in the [SSA] or any related document and whether the cause of action for any claim arises under or in connection with the [SSA] in contract or in tort, in negligence or for breach of statutory duty or otherwise, in relation to any and all causes of action as aforesaid…the total liability of [Motts] in the aggregate for all claims shall be limited to £500,000.
A further dispute then arose, in which Motts claimed that payment was outstanding under the SSA. Trant claimed that it had a counterclaim arising from Motts’ alleged “fundamental, deliberate, and wilful” breaches of the SSA.
Motts denied the allegations, but also argued that in any event the limitation clause excluded or limited its liability. Trant asserted that the clause could not exclude or restrict fundamental, deliberate, or wilful breaches.
Issues and Judgment
In determining whether such breaches fell within the scope of the exclusion clause, the judge considered that the correct approach remains as set out in Photo Production Ltd v Securicor Transport Ltd, which is that exemption clauses – including those purporting to exclude or limit liability for deliberate and repudiatory breaches – are interpreted using the normal principles of contractual construction, without the imposition of a presumption and without requiring any particular form of words to achieve the effect of excluding liability.
This means that:
- The court is to construe the contract so as to give effect to the parties’ intention, as revealed by the language read in context.
- In that exercise, the court will be conscious that exclusion of liability is a departure from the norm.
- In the absence of clear words, the court is unlikely to conclude that a clause should properly be construed as excluding liability.
- The nature of the term will be relevant in considering the parties’ intentions. While limiting liability is less of a departure from the norm than a total exclusion of liability, there is no presumption against the exclusion of liability and no requirement for any particular form of words. This is the case regardless of the nature of the breach for which liability is being excluded.
- As with any other contractual provision, if the language of an exclusion clauses is capable of only one meaning then effect must be given to it.
Applying this approach to the limitation clause in question, the judge found that it was “in clear terms” and “capable when read naturally of applying to the alleged breaches”. Therefore, even breaches which were fundamental, deliberate, or wilful were in scope.
It was also noted that the SSA was a bespoke agreement entered into by two commercial entities. As such, while criticisms could be made of the drafting, the imperfections did not prevent the clause from being logical or clear, and there was therefore no need to look beyond the words used on the page.
Commentary
This case serves as a sobering reminder to employers that clauses limiting, or even excluding, liability in a construction contract can work, preventing an employer from making an otherwise valid claim and leaving them seriously out of pocket. As Trant found in this instance, courts are reluctant to intervene where commercial entities have freely entered into contracts on the basis of negotiated terms. The courts will not rescue a party from a bad deal.
Clare Mendelle is a professional support lawyer and James Goldthorpe a paralegal at Sharpe Pritchard LLP
For further insight and resources on local government legal issues from Sharpe Pritchard, please visit the SharpeEdge page by clicking on the banner below.
This article is for general awareness only and does not constitute legal or professional advice. The law may have changed since this page was first published. If you would like further advice and assistance in relation to any issue raised in this article, please contact us by telephone or email
|
Click here to view our archived articles or search below.
|
|
ABOUT SHARPE PRITCHARD
We are a national firm of public law specialists, serving local authorities, other public sector organisations and registered social landlords, as well as commercial clients and the third sector. Our team advises on a wide range of public law matters, spanning electoral law, procurement, construction, infrastructure, data protection and information law, planning and dispute resolution, to name a few key specialisms. All public sector organisations have a route to instruct us through the various frameworks we are appointed to. To find out more about our services, please click here.
|
|
OUR RECENT ARTICLES
November 20, 2025
Strengthening the standards and conduct framework for local authorities in EnglandJames Berry offers his insight into how the proposed changes to standards and conduct rules will affect local authorities.
November 04, 2025
Procuring and operating open frameworks under the Procurement Act 2023Chantelle Pink offers advice to authorities on open frameworks and how to procure them.
October 31, 2025
Building Solar – 5 Top Tips for Solar Farm Construction ContractsSolar farm construction contracts are in focus following fascinating insights into the continuing global uptake and expansion of renewables, and particularly solar, within the 2025 mid-year report of Ember, a global energy think tank.
October 22, 2025
The ‘Hillsborough Bill’ – Voices for victims or just more lip service?Jonathan Blunden, Alastair Lewis and Conrad Turnock talk through the recently introduced 'Hillsborough' Bill, aimed at giving victims of state injustice a meaningful voice.
|
|
OUR KEY LOCAL GOVERNMENT CONTACTS
|
||
|
Partner 020 7406 4600 Find out more |
||
|
Partner 020 7406 4600 Find out more |
||
|
Rachel Murray-Smith Partner 020 7406 4600 Find out more |







Catherine Newman